4 set 12m³ wireless remote control grab ship to Africa!

During the epidemic, our factory production schedule is full . There have been many challenges, such as raw material prices increasing, epidemic blockade and high temperature weather, but every process is not allowed to be sloppy. Our team overcame the challenge and successfully delivered the grab within the fixed production cycle, which is inseparable from the cooperation of the workers and the quality inspection team. . And sprayed a very nice color ” eco-green”, this is a very special color that can bring hope and energy to us porters.

porters1 porters4 porters3 porters2


Post time: Aug-20-2022